Change Validation Pilot
€490 excl. VAT
Indicative scope: up to about 10 workloads
Review a migration caseVMware → Proxmox runtime change validation
Capture a runtime baseline before the move, repeat the observation after the move, and document whether sizing assumptions, workload behaviour and operating signals still hold.
Review a migration case View sample reportNo account required. Start with the scope, the migration window and the evidence you need.
InfraWatts complements RVTools, Live Optics and your existing assessment process. Your team keeps the migration tooling and execution.
One baseline before. One validation run after. One report your team can stand behind.
Available today: pre-change baseline, post-change observation and a reviewed before/after comparison for an agreed scope. Fully automatic cross-platform workload matching is still being developed.
An assessment explains what should work. Runtime validation checks whether the assumptions still hold once the change is real.
The comparison is reviewed against the workloads and scope agreed with the partner. InfraWatts does not yet guarantee fully automatic one-click workload matching between VMware and Proxmox.
Example workflow — not a customer case study.
Observed evidence does not replace engineering judgement. It gives the partner a measurable way to verify the assumptions before and after the infrastructure change.
A public demonstration report shows allocation, workload observations, recommendations and missing data. All example workloads are fictional.
Open sample reportFixed-scope project offers can include the pre-change baseline, the post-change validation window and the reviewed decision report for the agreed workload scope.
€490 excl. VAT
Indicative scope: up to about 10 workloads
Review a migration case€990 excl. VAT
Indicative scope: up to about 30 workloads
Review a migration case€1,490 excl. VAT
Indicative scope: up to about 75 workloads
Review a migration caseWorkload counts are proposed commercial scopes, not automatic SaaS entitlements. Collection, retention and export access must be configured for the agreed project; 75 workloads can require Enterprise capacity.
Add a repeatable, billable before/after validation stage to VMware → Proxmox work without replacing your assessment or migration tooling.
Tell us what is changing. We will review scope, available measurements and prerequisites with you before any commitment.
Contact