VMware → Proxmox runtime change validation

Don’t just size the migration. Prove what actually changed.

Capture a runtime baseline before the move, repeat the observation after the move, and document whether sizing assumptions, workload behaviour and operating signals still hold.

Review a migration case View sample report

No account required. Start with the scope, the migration window and the evidence you need.

InfraWatts complements RVTools, Live Optics and your existing assessment process. Your team keeps the migration tooling and execution.

One baseline before. One validation run after. One report your team can stand behind.

Available today: pre-change baseline, post-change observation and a reviewed before/after comparison for an agreed scope. Fully automatic cross-platform workload matching is still being developed.

Where InfraWatts fits in the migration

An assessment explains what should work. Runtime validation checks whether the assumptions still hold once the change is real.

  1. Existing assessment — RVTools / Live Optics / your current discovery and sizing workflow.
  2. Pre-change runtime baseline — Observe supported workload metrics, peaks, utilisation patterns and missing evidence before migration.
  3. Pilot or migration — Your team executes the agreed VMware → Proxmox change with its existing tools and procedures.
  4. Post-change validation — Repeat the observation, review matched workloads and document material deltas, risks and follow-up actions.

The comparison is reviewed against the workloads and scope agreed with the partner. InfraWatts does not yet guarantee fully automatic one-click workload matching between VMware and Proxmox.

What the partner can add to the migration invoice

Example workflow — not a customer case study.

Assessment only

  1. VMware inventory
  2. Allocated vCPU / RAM
  3. Target sizing assumptions
  4. Migration
  5. Project closure

Assessment + InfraWatts runtime proof

  1. VMware inventory
  2. Pre-change runtime baseline
  3. Target sizing decision
  4. Migration / pilot
  5. Post-change runtime observation
  6. Reviewed delta report

Observed evidence does not replace engineering judgement. It gives the partner a measurable way to verify the assumptions before and after the infrastructure change.

See the evidence before creating an account

A public demonstration report shows allocation, workload observations, recommendations and missing data. All example workloads are fictional.

Open sample report

Project validation first. SaaS only if it is useful afterwards.

Fixed-scope project offers can include the pre-change baseline, the post-change validation window and the reviewed decision report for the agreed workload scope.

Enterprise / multisite

Contact us

Workload counts are proposed commercial scopes, not automatic SaaS entitlements. Collection, retention and export access must be configured for the agreed project; 75 workloads can require Enterprise capacity.

  1. No mandatory SaaS subscription to buy a change-validation project.
  2. Scope, observation windows, data sources, matching method and exclusions are agreed before the start.
  3. Your migration team executes the infrastructure change; InfraWatts observes and documents.
  4. Continuous monitoring or a subscription can be added afterwards as a separate service.

Built to sit inside an MSP or integrator migration offer

Add a repeatable, billable before/after validation stage to VMware → Proxmox work without replacing your assessment or migration tooling.

  1. You keep the customer relationship and the migration delivery.
  2. InfraWatts captures the pre-change runtime baseline.
  3. A second observation after the move checks the same agreed scope.
  4. The reviewed report documents deltas, missing evidence and follow-up actions.
Discuss a 10-minute partner case

Review a migration case

Tell us what is changing. We will review scope, available measurements and prerequisites with you before any commitment.